the achievement list of manufacture and overhaul for bcp by he fei wan hua company-凯发k8娱乐备用网址-首页

font size:  2015-9-2  views: 1208
 at present,our company have overhauled and produced bcp 738 sets,produced auxiliary cooling circulating pump 44 sets, produced external magnetic filter 72 sets,108 power plants have deep cooperation with our company. for detail,please check the following list: 
serial no. name of clients type manufacturer the content of project quantity
1 shang hai boiler factory  400wlb-1765/153-1100kw /6kv wan hua in he fei   manufacture of the entire bcp unit。 2
2 shang hai electric research institution wlb bcp 380v 5.5kw wan hua in he fei   manufacture of the ultra supercritical pressure water pump 1
3 shang hai wai gaoqiao power plant u282.h.4.92 210kw 6kv tyler in uk change the winding wire and terminal of the stator,change friction pair of guiding bearing and main wearing parts 29
4 shang hai wu jing thermal power plant luv5/4gv20-605 200kw 6kv ksb in germany change the winding wire and terminal of the stator,change friction pair of guiding bearing and main wearing parts 11
50acsm-12/26-4.5/2-21 wan hua in he fei   design and produce auxiliary cooling circulating pump(patent) 4
whglq-40-31 wan hua in he fei   manufacture of external magnetic filter 3
390kw   6kv tyler in uk maintenance,grinding and modification of guide bearing 6
5 shang hai wu jing second power plant 390kw   6kv tyler in uk maintenance,grinding and mapping of parts 14
390kw   6kv wan hua in he fei   manufacture of the entire bcp unit。 1
6 shang hai bao gang power plant tpm195/36-2 450kw 380v fuji in japan change the winding wire and terminal of the stator,change squirrel cage bar and coil of rotor and change the short ring 13
hlav5/4gv35-605 350kw 6kv fuji in japan maintenance of winding,change the terminal and thrust pad 2
7 shang hai ksb company luv5/4fv40-605 400kw 6kv ksb in germany change the winding and the terminal,grinding the main wearing part 1
8 shang hai cao jing power plant 1100kw 10kv改6kv tyler in uk technical modification,change high voltage to low;change winding wire 3
9 jiang su wang ting power plant u282.h.4.92 210kw 6kv tyler in uk change the winding and the terminal,build the rotor and maintenance 18
500kw 6kv tyler in uk maintenance,grinding and mapping of parts 1
10 hua neng tai cang power plant 210kw 380v tyler in uk change the winding and the terminal,grinding and change the main wearing parts 7
11 xie xin power plant in tai cang u268. h.4.92 200kw 6kv tyler in uk modification of silicon steel lamination of stator and guide bearing,change the winding and the terminal 13
12 jian bi power plant in jiang su u282.h.4.92 210kw 6kv tyler in uk change the winding wireand the terminal,modification of upper and downside guide bearing and bearing bushmanufacture one stator. 29
u268.h.4.92 200kw 6kv
50acsm-12/26-4.5/2-21 wan hua in he fei   design and produce auxiliary cooling circulating pump(patent) 6
whglq-42-33 wan hua in he fei   manufacture of external magnetic filter 4
13 xu tang power plant in jiang su u282.h.4.92 210kw 6kv tyler in uk modification of silicon steel lamination of stator and guide bearing,change the winding and the terminal 20
u268.h.4.92 200kw 6kv
14 peng cheng power plant in jiang su 1100kw 10kv改6kv tyler in uk technical modification,change high voltage to low;change winding wire 1
15 hua run power plant in nan jing u268.h.4.92 200kw 6kv tyler in uk modification of silicon steel lamination of stator and guide bearing,change the winding and the terminal 9
16 nan re power plant in jiang su luv5/2dq40-605 400kw 6kv ksb in germany maintenance and grinding the main wearing part 1
whglq-40-31 wan hua in he fei   manufacture of external magnetic filter 2
17 hua xin power plant in xu zhou u268.h.4.92 200kw 6kv tyler in uk maintenance and grinding the main wearing part,modification of guide bearing 11
18 kan shan power plant in jiang su luv5/2dq30-605 300kw 6kv ksb in germany cleaning,maintenance and repairing the motor and sealing surface of pump case 3
19 guo dian chang zhou power plant luv5/2dq30-605 300kw 6kv ksb in germany maintenance and grinding the main wearing part,modification of guide bearing 2
20 xia gang power plant in jiang yin 225kw 6000v wan hua in he fei   manufacture one stator. 1
225kw 6kv tyler in uk change winding wire and main wearing parts 7
21 jia xing power plant in zhe jiang 210kw 380v tyler in uk maintenance,adjust,grinding and change the main wearing parts 1
22 zhe neng jia hua power plant  luv6/2cq50-605 500kw 6kv ksb in germany change winding wire and main wearing parts 1
23 hua neng yu huan power plant  luv6/2cq50-605 500kw 6kv ksb in germany maintenance,adjust,grinding and change the main wearing parts 5
whglq-42-33 wan hua in he fei   manufacture of external magnetic filter 4
24 bei lun power plant in zhe jiang 440kw 6kv tyler in uk maintenance,adjust,grinding and change the main wearing parts 5
25 wu sha shan power plant in zhe jiang 5/2dq30-605 300kw 6kv ksb in germany change the winding and the terminal,grinding the main wearing part 3
26 zhe neng ning hai power plant  luv5/4fv40-605 6kv 400kw ksb in germany maintenance,adjust,grinding and change the main wearing parts 8
27 zhe neng lan xi power plant  650kw 6kv ksb in germany maintenance,grinding and change the main wearing parts 1
28 sha jiao c power plant in guang dong u600.h.4.92 448kw 3kv tyler in uk change the winding wire and terminal,maintenance,grinding and change the main wearing parts 20
29 sha jiao a power plant in guang dong luv5/4gv20-605 200kw 6kv ksb in germany change the winding wire and terminal of the stator,change friction pair of guiding bearing and main wearing parts 9
30 zhu hai power plant in guang dong hlav6/4 gq45-605 450kw 6kv torishima in japan change the winding wire and terminal,maintenance,grinding and change the main wearing parts 6
31 he yuan power plant in guang dong luv5/2dq30-605 300kw 6kv ksb in germany maintenance,grinding and change the main wearing parts 2
32 tai shan power plant in guang dong 340kw/325kw 6kv tyler in uk change winding wire and main wearing parts 16
33 da tang international group chao zhou power plant luv6/2cq50-605 500kw 6kv ksb in germany change winding wire,maintenance,grinding and change the main wearing parts 3
5/2cq30-605 300kw 6kv ksb in germany maintenance,grinding and change the main wearing parts 3
whglq-42-33 wan hua in he fei   manufacture of external magnetic filter 4
34 ma wan power plant in shen zhen luv55/4fq20-605 200kw 6kv ksb in china change the winding wire and terminal,maintenance,grinding and change the main wearing parts 21
50acsm-12/26-4.5/2-2 wan hua in he fei   design and produce auxiliary cooling circulating pump(patent) 7
35 ning de power plant in fu jian luv5/2dq30-605 300kw 6kv ksb in germany change the winding wire and terminal,and change the main wearing parts 1
36 hua neng international group hai men power plant 440kw   6kv tyler in uk maintenance,grinding and change the main wearing parts 3
whglq-42-33 wan hua in he fei   manufacture of external magnetic filter 3
37 guo dian fu zhou power plant luv5/2dq30-605 300kw 6kv ksb in germany maintenance,grinding and change the main wearing parts 4
whglq-40-31 wan hua in he fei   manufacture of external magnetic filter 4
38 hua neng international group fu zhou power plant luv4/4 dv24-045 240kw 380v torishima in japan maintenance,adjust,grinding and change the main wearing parts 1
39 tian jia an power plant in an hui luv55/4fq-605 200kw 6kv ksb in china change the winding wire and terminal,maintenance.manufacture one stator. 8
40 luo he power plant in an hui luv55/4fq-605 200kw 6kv ksb in china change the winding wire and terminal,maintenance,grinding and change the main wearing parts 21
41 ping wei power plant in an hui luv5/2dq30-605 300kw 6kv ksb in germany change the winding wire and terminal,repairing the rotor,grinding the main wearing parts 2
300wlbd-200/2-6 300kw 6kv wan hua in he fei   manufacture of the entire bcp unit。 1
whglq-40-31 wan hua in he fei   manufacture of external magnetic filter 2
42 tong ling power plant in an hui luv55/4fq-605 200kw 6kv ksb in china change the winding wire and terminal,grinding the main wearing parts 4
whglq-42-33 wan hua in he fei   manufacture of external magnetic filter 1
luv6/2cv75-605 750kw 6kv ksb in china maintenance,adjust,grinding and change the main wearing parts 1
43 jiu hua power plant in an hui luv55/4fq-605 200kw 6kv ksb in china change the winding wire and terminal,maintenance 8
44 hua neng chao hu power plant  luv5/2dq30-605 300kw 6kv ksb in germany maintenance,grinding and change the main wearing parts 9
whglq-42-33 wan hua in he fei   manufacture of external magnetic filter 2
45 guo dian beng bu power plant  luv5/2dq30-605 300kw 6kv ksb in germany maintenance and grinding the main wearing part,modification of guide bearing 4
whglq-40-31 wan hua in he fei   manufacture of external magnetic filter 2
46 da tang international group pan shan power plant luv5/4hq40-605 400kw 6kv ksb in germany change the winding wire and terminal,grinding the main wearing parts 7
47 huang tai power plant in shan dong 225kw 380v tyler in uk maintenance,adjust,grinding and change the main wearing parts 1
48 hua dian qing dao power plant 210kw 380v tyler in uk change the winding wire and terminal,modification of guide bearing,grinding and change the main wearing parts 24
49 guo dian shi heng power plant 6kv改380v 、200kw 6kv/210kw 380v ksb/tyler technical modification,change high voltage to low;change winding wire.manufacture of stator and rotor 9
50acsm-12/26-4.5/2-21 wan hua in he fei   design and produce auxiliary cooling circulating pump(patent) 4
210kw 380v wan hua in he fei   manufacture of the entire bcp unit。 1
50 hua neng liao cheng thermal power plant u268. h.4.92 200kw 6kv tyler in uk modification of silicon steel lamination of stator and guide bearing,change the winding and the terminal 10
50acsm-12/26-4.5/2-21 wan hua in he fei   design and produce auxiliary cooling circulating pump(patent) 2
51 hua dian zhang qiu power plant u268. h.4.92 200kw 6kv tyler in uk modification of silicon steel lamination of stator and guide bearing,change the winding and the terminal 6
200kw   6kv wan hua in he fei   manufacture of the entire bcp unit。 1
52 hua neng lai wu power plant 50acsm-12/26-4.5/2-2 wan hua in he fei   design and produce auxiliary cooling circulating pump(patent) 2
u268.h.4.92 200kw 6kv tyler in uk change the winding wire and terminal,modification of guide bearing and stator 3
53 hua neng jia xiang power plant 50acsm-12/26-4.5/2-21 wan hua in he fei   design and produce auxiliary cooling circulating pump(patent) 2
u268. h.4.92 200kw 6kv tyler in uk change the winding wire and modification of guide bearing and stator silicon lamination 4
54 hua neng yun he power plant in ji ning 200kw 380v tyler in uk modification of guide bearing,maintenance and grinding main wearing parts  6
55 hua dian teng zhou power plant  u268. h.4.92 200kw 6kv tyler in uk change the winding wire and terminal,modification of guide bearing and stator silicon lamination 7
200kw 6kv wan hua in he fei   manufacture of the entire bcp unit。 1
56 han chuan power plant in hu bei 230kw/210kw   380v tyler in uk change the winding wire,modification of guide bearing.manufacture two stators.  16
57 da bie shan power plant in huang gang luv5/2dq30-605 300kw 6kv ksb in germany maintenance and grinding the main wearing part,modification of guide bearing 3
whglq-40-31 wan hua in he fei   manufacture of external magnetic filter 1
58 yi yang power plant in hu nan luv5/2dq30-605 300kw 6kv ksb in germany maintenance and grinding the main wearing part,modification of guide bearing 4
whglq-40-31 wan hua in he fei   manufacture of external magnetic filter 2
59 jin zhu shan power plant in hu nan luv6/2cq50-605 500kw 6kv ksb in germany maintenance,adjust,grinding and change the main wearing parts 1
whglq-42-33 wan hua in he fei   manufacture of external magnetic filter 1
60 qin huang dao power plant in he bei u282.h.4.92 210kw 6kv tyler in uk change the winding wire and terminal,maintenance and change the wearing parts 11
lbm 535-210/4 210kw 6kv wan hua in he fei   change the winding wire and terminal,install the internal magnetic filter. 1
lbm 535-210/4 210kw 6kv wan hua in he fei   manufacture of the entire bcp unit。 1
50acsm-12/26-4.5/2-21 wan hua in he fei   design and produce auxiliary cooling circulating pump(patent) 2
61 ding zhou power plant in he bei 340kw 6kv tyler in uk change the winding wire,terminal and the main wearing parts. 9
62 da tang international group wang tan power plant luv5/4fv40-605 400kw 6kv ksb in germany change the winding wire and terminal,grinding the main wearing parts 3
63 qing he power plant in liao ning luv5/2dq30-605 300kw 6kv ksb in germany manufacture heat barrier;maintenance and grinding the main wearing parts 3
whglq-40-31 wan hua in he fei   manufacture of external magnetic filter 2
64 sui zhong power plant in liao ning luv6/2cq50-605 500kw 6kv ksb in germany inspect the high pressure cooling water system and clean the high pressure filter net. maintenance. 2
whglq-42-33 wan hua in he fei   manufacture of external magnetic filter 2
65 zhuang he power plant in da lian 5/2dq30-605 300kw 6kv ksb in germany change the winding wire and terminal,maintenance and change the wearing parts 2
whglq-42-33 wan hua in he fei   manufacture of external magnetic filter 2
66 guo dian kang ping power plant  luv5/2dq30-605 300kw 6kv ksb in germany change the winding wire and terminal,maintenance and change the wearing parts 3
whglq-40-31 wan hua in he fei   manufacture of external magnetic filter 2
67 bai cheng power plant in ji ling luv54/2eq40-1005 400kw 10kv ksb in germany maintenance,adjust,grinding and change the main wearing parts 1
whglq-40-31 wan hua in he fei   manufacture of external magnetic filter 4
68 tuo ke tuo power plant in nei meng gu luv5/4hq40-605 400kw 6kv ksb in germany change the winding wire and terminal,maintenance and change the wearing parts 2
69 bao tou power plant in nei meng gu luv5/4fv40-605 400kw 6kv ksb in germany maintenance,adjust,grinding and change the main wearing parts 3
70 yi min power plant in nei meng gu luv6/4fq50-605 400kw 6kv ksb in germany change the winding and the terminal,grinding and change the main wearing parts 1
whglq-42-33 wan hua in he fei   manufacture of external magnetic filter 1
71 dai hai power plant in nei meng gu 325kw 6kv tyler in uk change the winding wire and terminal,maintenance and change the wearing parts 6
72 ya he kou power plant in he nan 300kw 380v tyler in uk maintenance and change the wearing parts and friction pair of guide bearing. 9
73 luo he power plant in he nan 50acsm-12/26-4.5/2-21 wan hua in he fei   design and produce auxiliary cooling circulating pump(patent) 2
m54/98.4-40-605 400kw 6kv ksb change the winding and the terminal,grinding and change the main wearing parts 6
74 jin jie power plant in shan xi 400kw 10kv ksb in germany change winding wire and main wearing parts 12
75 han cheng second power plant in shan xi luv5/4fv40-605 400kw 6kv ksb in germany change the winding wire and terminal,maintenance and change the wearing parts 2
76 he jin power plant in shan xi hlav300-420/1c 220kw 6kv torishima in japan change the winding wire and terminal,maintenance and change the wearing parts 5
77 he qu power plant in shan xi luv54/2eq40-1005 400kw 10kv ksb in germany site instruction,maintenance,adjust,grinding and change the main wearing parts 4
whglq-42-33 wan hua in he fei   manufacture of external magnetic filter 2
78 tai gang power plant in shan xi hlv342 170kw 380v torishima in japan change the winding wire and terminal.change the squirrel cage coil of rotor and short ring. 3
lbm305-170/2 170kw 380v wan hua in he fei   maintenance the winding,change the terminal,nuts of impeller and grinding main wearing parts. 1
lbm305-170/2 170kw 380v wan hua in he fei   manufacture of the entire bcp unit。 1
79 shen tou second power plant in shan xi luv6/4gv65-605 650kw 6kv ksb in germany maintenance and grinding main wearing parts. 1
275kw 6kv tyler in uk change the winding wire and terminal.measure and change the main wearing parts. 16
80 zhang shan power plant in shan xi 380kw 6kv tyler in uk maintenance,modification of guide bearing,grinding the main wearing part. 6
81 wu xiang power plant in shan xi 325kw 10kv tyler in uk change the winding wire and modification of guide bearing,measure and change the main wearing parts 4
82 feng cheng power plant in jiang xi luv55/4fq20-605 200kw 6kv ksb in china change the winding wire and terminal,maintenance and change the wearing parts 8
50acsm-12/26-4.5/2-21 wan hua in he fei   design and produce auxiliary cooling circulating pump(patent) 8
83 jiang you power plant in si chuan 195kw 380v tyler in uk leakage treatment on site 1
84 jharsuguda power plant in indian luv6/4iv40-1105 400kw 11kv ksb in germany maintenance,adjustment and change slider and thrust pad 3
85 mundra power plant in indian luv5/2dq40-665 400kw 6600v ksb in germany maintenance,adjust,grinding and change the main wearing parts 4
whglq-42-33 wan hua in he fei   manufacture of external magnetic filter 7
86 jhajjar power plant in indian luv54/2fq40-1105 400kw 11kv ksb in germany maintenance,adjustment and change slider and thrust pad 1
87 hua run electric deng feng power plant  whglq-42-33 wan hua in he fei   manufacture of external magnetic filter 2
88 tai zhou power plant in jiang su luv6/2cq50-605 500kw 6kv ksb in germany maintenance of winding,change the thrust plate,grinding the wearing part 2
89 hua neng ping liang power plant  400kw 6kv ksb in germany maintenance of winding,change the terminal and thrust plate,grinding the wearing part 2
whglq-42-33 wan hua in he fei   manufacture of external magnetic filter 3
90 peng lai power plant in shan dong luv4/4/dv25-045 250kw 380v ksb in germany maintenance of winding,change the thrust plate,grinding the wearing part 5
91 he ze power plant in shan dong 500kw 6kv tyler in uk modification of guide bearing,change the non-metal surface of thrust plate and thrust pad. 2
92 lu jin wang qu power plant in shan xi luv5/4fv40-605 400kw 6kv ksb in germany maintenance of winding,change the terminal,grinding the wearing part 2
93 guo hua cang dong power plant in he bei 400kw 6kv ksb in germany replace of winding,grinding the wearing part 6
94 hua dian ling wu power plant in ning xia luv6/4iv40-1005 400kw 10kv ksb in germany replace of winding wire and terminal,grinding the wearing part 6
95 tian sheng gang power plant in nan tong 200kw 6kv tyler in uk replace of winding wire and terminal,modification of stator and upper and lower guide bearing 2
96 hua run cang nan power plant in zhe jiang hlv75/2cv50-1005 500kw 10kv torishima in japan change the guide bearing on pump end and cover end,grinding the main wearing part. 1
97 san he power plant  jec-37-1979 260kw 6kv fuji in japan change the winding and the terminal,grinding and change the main wearing parts 1
98 hua neng zhao jin power plant in tong chuan luv5/4fv40-605 400kw 6kv ksb in germany replace of winding wire,grinding the wearing part 6
99 hua guang power plant in shan xi 400kw 10kv ksb in germany replace of winding wire,grinding the wearing part 1
100 the orient boiler factory 350wlb-965/135-450            450kw 10kv wan hua in he fei   manufacture two bcps for wan zhou project  2
whglq-42-33 wan hua in he fei   manufacture of external magnetic filter 1
101 da tang yun cheng power plant in shan xi 400kw 3kv ksb in germany maintenance of winding,change the terminal,grinding the wearing part 1
102 de yuan fu gu power plant in shan xi luv6/4iv40-605 400kw 10kv ksb in germany maintenance of winding,guide bearing etc,adjust the clearance of wearing part 3
103 gui xi power plant in jiang xi luv5/2dq40-605 400kw 6kv ksb in germany maintenance of winding,modify the flow passage of thrust bearing 2
whglq-42-33 wan hua in he fei manufacture of the outer magnatic filter 1
104 nan tong power plant in jiang su 920kw 6kv tyler in uk modify the guide bearing,change the terminals,repair the stator core of motor 1
105 pan nan power plant in gui zhou 325kw 6kv tyler in uk modify the guide bearing,change the terminals,repair the stator core of motor 5
106 hua nan power plant in da lian luv4/4dv-045 240kw 380v torishima in japan modify the guide bearing,change the terminals,repair the stator core of motor 1
107 hua run power plant in chang shu whglq-42-33 wan hua in he fei manufactured one external magnetic filter 3
108 wenzhou power generation co.,ltd in zhe jiang province luv45/2dv50-605     9972639442/400 ksb in germany maintenance of winding,change the terminal,grinding the wearing part 1
 